Results tagged ‘ Agriculture ’

Tips on Designing a Professional Baseball Field


   

Below  are a few general tips and considerations that can be used as a template or checklist when planning and or  building a baseball field.  First and foremost.

  • Hire your sports turfmanager, or field consultant.
    • Develop maintenance budget and begin to order equipment. A reputable field contractor can install a professional level field in 45 days so it’s important to be ready to take care of it when they lay down the grass.
  • Secure the services of a qualified surveyor and field contractor and or field project director. Making small mistakes during the planning period could result in costly maintenance problems down the road.
  • If you’re sodding the field, locate the grass source and determine the type you need based on your area.  It’s important to do this early in the process so you can have the turf tested and growing properly before it harvested.
  • Determine elevation and grade lines to confirm what existing grades are and how they will change to allow your field to drain properly.
  • Have a soil analysis completed to find out what type of soils your site consists of.  You will want to send the soil sample to a certified testing service that understands the difference between testing soils for roads, builds and sports fields. They are very different tests.  They will test for particle size, percolation, soluble salts and PH.
  • Roto-till hard pan and subsurface soil if your site proves to be an impermeable surface.
  • Install irrigation system mainlines and outlets.
  • Excavate and pour concrete footings for light towers, dugouts, stands and locker room.
  • Install the drain tile system, drain outlets, sewer system.
  • Install electric lines, cables, outlets to light towers, dugouts and stands
  • Lay out stabilized areas; haul in aggregate for warning tracks, paths to home plate in front of dugouts, coach’s box, on deck, and fungo circles.
  • Replace or prepare native topsoil – from soil analysis formula, mix in soil structure amendments. This material can be stockpiled on site.  Again if you are building a sand based field system you will remove all of the soil from the existing field and replace it with a pea gravel drainage system and sand based root zone for the growing medium.
  • Sterilize native soil materials if possible. Taking care of the weeds in this material can save a lot of money trying to spray out weeds in the future.
  • Roto-till the soil for uniform and thorough mixing. Rework the area to grade elevations with laser grader
  • Recheck grade elevations with surveyor’s report.
  • Roll the area to a firm soil.
  • Install backstops, fences, scoreboard, flag pole, foul line marker.
  • Build a pitcher’s mound
  • Spread a starter fertilizer before laying down your grass
  • Finish grading with laser device.
  • Remeasure diamond and recheck grade elevations carefully.
  • Set the home plate, pitchers plate, base anchors.
  • Mark all grass lines, circles, arcs and boxes with chalk or lime.
  • Plant the area (seed, vegetatively, or sod)
  • Build your bullpens and install warning track
  • Finish construction and installation of dugouts, light towers, stands, locker rooms, showers, toilets, storage space, concession stands, and parking lots
Follow

Get every new post delivered to your Inbox.

Join 4,490 other followers