Results tagged ‘ Washington DC ’

Protecting the National Mall’s turf for the Presidential Inauguration


2013-01-19 08.42.58Today’s 57th  Presidential Inauguration in Washington DC will take place on some new turfgrass and fortunately it will be well protected by a special cover designed to allow light and rain through the product.    The National Mall recently underwent a major renovation of the first 4 panels in front of the US Capital building which you can see in my previous blogs.  Planning for the Inauguration event has been on the top of the agenda since we started with the project.

teraplast

Similar to what is used at MLB baseball stadiums for concerts,  the flooring called  Teraplast is one of several types of turf protection being used to protect the mall’s 6 1/2 acres of newly installed  tall type fescue turfgrass.   They started installing the cover about 3 days ago and will begin to remove it this afternoon when the president is heading back to the white house.

cnnWith over 400,000 sq ft of teraplast being installed in various areas around the mall including under the main tents of the CBS and CNN structures,  it’s the most ever laid in one place according to the installers.   In fact they had to obtain the flooring from multiple sports venues around the USA.

stachowicz and murray

My good friend Steve Legros is heading up the install of the cover and the mall’s new turf manager Mike Stachowicz  ( photo above) is finally on board to help bring the new grass out of dormancy and to keep it looking great.  Congrats to him on his new job and to Steve and the Teraplast crew for doing a great job at the Mall.

laying sod

Our Nation’s Front Yard gets new Turf!


After a light morning rain the soil was perfect for laying sod on the National Mall yesterday.  The 50 ft long x  4 ft wide fescue/bluegrass rolls of sod went down without a hitch.    Probably some of the most beautiful fescue I have ever seen that came out of Tuckahoe sod farms.  Shortly after the first few rolls were place on Panel 33 in front of the capital they turned on the big eagle rainbird irrigation  heads and they performed wonderfully.   The irrigation and drian lines are placed about 4ft deep which is just below the tent stake line.

This day has been a long time coming and it wasn’t without a lot of planning.  The sod was laid on an engineered topsoil sand blend which will be a perfect medium for growing the grass and keeping it healthy.    The National Parks services and Trust for the national mall were also on hand overseeing the installation process.  The first panel  which is about 90,000sq ft will be completed today and in another few weeks we will start on panel 29.  Congrats to Clark construction there team on making this day finally come to fruition.

Follow

Get every new post delivered to your Inbox.

Join 4,594 other followers